Friday 28 July 2017

Procedures for Ballasting, Deballasting and Loading Operations


On completion of this chapter you will have an understanding of:

·        The procedures for loading.
·        The obligation to inform superiors.
·        The standard record requirements.
·        The alerting sequence and response in case of emergency.
·        The effect on moorings during loading.
·        The principles of the Vapour Return System (VRS) or Volatile Emission Control System (VECS).
·        The procedures for topping off cargo tanks and completion of loading.
·        The process of final cargo survey, ullage – temperatures water dips - sampling – cargo calculation.
·        The process for cargo release.

No comments:

Post a Comment